Intelligent software

noguesswork

We plan in Reonic — the industry standard for demanding PV projects. Measurable foundations for your investment decision.

  1. 01

    Assessment

    Location, roof area, consumption profile, grid connection — we record everything a sound plan needs.

  2. 02

    Planning & Reonic

    Precise system design in Reonic: 3D simulation, shading analysis, yield calculation and proof of economic viability.

  3. 03

    Engineering & approval

    Complete applications, grid registration and correspondence with the authorities under local law — we take all of it on.

  4. 04

    Installation & commissioning

    Assembly by certified partners under our site supervision. Commissioning, handover and full documentation included.

Planning

  • 3D roof planning — exact module layout based on real building data
  • Shading analysis — hour-by-hour simulation across the whole year
  • Yield calculation — specific to Mallorca, documented to bankable standard
Reonic 3D planning view with module layout on a gabled roof

Calculation

  • Payback calculation — transparent viability figures including subsidies
  • Room-by-room building survey as the basis for heating and storage sizing
  • Traceable assumptions instead of rounded rules of thumb
Building model with rooms and normalised heating load calculation

Documentation

  • Professional records — print-ready plans for authorities, grid operators and banks
  • Complete system documentation at handover
  • One data set that every party refers to
Overview of solar system, battery storage and yield calculation
Aerial image of a gabled roof with three colour-separated module fields in green, orange and magenta
Layout by roof faceEach roof face gets its own module field, colour-separated by orientation. Dormers, chimney and clearance zones are kept free before the first module is ordered.
Aerial image of a sprawling property with module fields marked in yellow on several roof faces
Layout across several roof facesRambling properties are planned as a whole: the modules spread across every load-bearing surface, and the yield is calculated for each one separately.

Both views are produced photogrammetrically: overlapping drone images yield a dimensionally accurate building model — the layout is planned on that, not on a photograph.

Approval

Local law, German process discipline.

We take on applications, grid registration and correspondence with the authorities in full. The project is run to recognised project management standards — with a work breakdown structure and milestone plan, regular status reports, risk management and a defined change request procedure.

Start a project